Hospitality FFE execution process

The full-chain model. From drawing to install.

No brokers, no dropped handoffs, and no sub finger-pointing. We manage the entire lifecycle of your hotel FF&E under one roof with single-source accountability.

5-Phase Execution

A proven milestone system designed for hotel renovation schedules

01

Scope & PIP Audit

We review your brand PIP inspection or architectural drawings, perform field verifications, identify value-engineering options, and generate a transparent line-item proposal within 48 hours.

02

CAD & Shop Submittals

Our drafting team generates fully dimensioned CAD elevations, cross sections, finish boards, and physical pre-production sample approvals for franchise portal sign-off.

03

Factory Production & QA

Bulk manufacturing commences across our dedicated casegoods lines, seating lines, and millwork shops, with weekly production QA check-ins and ocean freight tracking.

04

Houston Staging

Full containers are received directly at our Houston warehouse, unloaded, barcoded, inspected for transit damage, and staged safely indoors out of the elements.

05

Phased Room Install

We dispatch phased floor deliveries aligned with your GC turnover schedule. Our installation crews assemble, cleat, level, and punch out every room to brand QA inspection standards.

Turnkey hotel FF&E manufacturing

Direct Turnkey Partner